Facilities & Operations

 

HOURS OF OPERATION

Monday - Thursday, 8 a.m. to 4:30 p.m.
Friday, 8 a.m. to 4 p.m.

MAILING ADDRESS

800 S. College Drive
Santa Maria, CA  93454

Fine Arts Complex Upcoming

The Fine Arts Complex is a new 68,000 sq. ft. two-story building that includes visual arts, multi-media and applied design, photography, film and video, dance, music, and shared amenities.  The project consolidates all of the fine arts and performing arts (except theatre arts) currently in buildings D, E, F, O, and S, into one Fine Arts Complex.  The district is also developing bid alternates; such as, the Theatre Arts Complex, south commons site utility infrastructure and landscape improvements, and reconstruction of parking lot 8 (gym parking lot). Read More »

Theatre Arts Complex Upcoming

The Theatre Arts Complex was approved by the board of trustees as a bid alternate to the Fine Arts Complex.  The concept design, including remodeling building F, demolishing building E, and constructing a 19,600 sq.ft. stand-alone structure in its footprint was approved by the board at the January 18, 2011 meeting. Read More »

One Stop Student Services Center (OSC)
The One Stop Student Services Center consists of a new 44,788 sq. ft. two-story student services building (building A) and a new 21,053 sq. ft. two-story administration building (building B) with associated on- and off-site improvements targeting LEED Silver Certification. A new north Bradley Road driveway, north-east loop road, and parking lot in accordance with the board approved 2008 Bond Measure I, Facilities Site and Utilities Master Plan were also constructed.  The project also included the demolition of former buildings A, B, I, N-Annex, T, U, V, and X. 

Childcare Center Addition (CCA)
The Childcare Center Addition project consists of a 11,666 gross building sq. ft. addition (approx. 8,900 building sq. ft. and 2,700 sq. ft. of canopies and overhangs) to the existing building J on campus.  The addition will replaced the existing building Z which was demolished upon completion of the project.  The project provided additional classrooms to accommodate the increased number of children.  The project also included construction of a hands-on learning lab for the degree and certificate programs in early childhood studies. 

Public Safety Complex (PSC)
The Public Safety Complex is located at the Lompoc Valley Center.  The project consisted of a 36,678 sq. ft. academic building, 8,568 sq. ft. six-story fire tower, 12,286 sq. ft. apparatus storage building, a 42,406 sq. ft. shooting range, scenario village, prop house, fitness track, skid pad/slow speed driving skills area, and a one-mile emergency vehicle operator course (EVOC).

Industrial Technology Under Construction (IND)
The Industrial Technology and Physical Education/Athletic Fields project provided a new facility with space for the Industrial Technology programs including:  automotive transportation technology, auto body technology, architecture/engineering technology, machine technology, welding, and administrative support. 

 

contractor registration

Register to be an AHC contractor

AHC has adopted the CUPCCAA program for all public works projects. To be added to the prequalified list, contractors must complete the online prequalification form 

Last Modified Feb 24, 2015