Facilities & Operations

 

HOURS OF OPERATION

Monday - Thursday, 8 a.m. to 4:30 p.m.
Friday, 8 a.m. to 4 p.m.

MAILING ADDRESS

800 S. College Drive
Santa Maria, CA  93454

Fine Arts Complex Upcoming

The Fine Arts Complex is a new 68,000 sq. ft. two-story building that includes visual arts, multi-media and applied design, photography, film and video, dance, music, and shared amenities.  The project consolidates all of the fine arts and performing arts (except theatre arts) currently in buildings D, E, F, O, and S, into one Fine Arts Complex.  The district is also developing bid alternates; such as, the Theatre Arts Complex, south commons site utility infrastructure and landscape improvements, and reconstruction of parking lot 8 (gym parking lot). Read More »

Theatre Arts Complex Upcoming

The Theatre Arts Complex was approved by the board of trustees as a bid alternate to the Fine Arts Complex.  The concept design, including remodeling building F, demolishing building E, and constructing a 19,600 sq.ft. stand-alone structure in its footprint was approved by the board at the January 18, 2011 meeting. Read More »

One Stop Student Services Center (OSC)
The project is constructing a new 44,788 sq. ft. two-story student services building (building A) and a new 21,053 sq. ft. two-story administration building (building B) with associated on- and off-site improvements targeting LEED Silver Certification.  In addition, the project develops a new north Bradley Road driveway, north-east loop road, and parking lot in accordance with the board approved 2008 Bond Measure I, Facilities Site and Utilities Master Plan.  The project also includes the demolition of existing buildings A, B, I, N-Annex, T, U, V, and X. Read More »

Childcare Center Addition (CCA)
The Childcare Center Addition project consists of a 11,666 gross building sq. ft. addition (approx. 8,900 building sq. ft. and 2,700 sq. ft. of canopies and overhangs) to the existing building J on campus.  The addition will replace building Z which is scheduled for demolition upon completion of the project.  The project will provide additional classrooms to accommodate the increased number of children that are housed in the to-be demolished building Z.  The project will also provide a hands-on learning lab for the degree and certificate programs in early childhood studies. Read More »

Public Safety Complex (PSC)
The Public Safety Complex is located at the Lompoc Valley Center.  The project consists of a 36,678 sq. ft. academic building, 8,568 sq. ft. six-story fire tower, 12,286 sq. ft. apparatus storage building, a 42,406 sq. ft. shooting range, scenario village, prop house, fitness track, skid pad/slow speed driving skills area, and a one-mile emergency vehicle operator course (EVOC). Read More »

Industrial Technology Under Construction (IND)
The Industrial Technology and Physical Education/Athletic Fields project provides a new facility with space for the Industrial Technology programs including:  automotive transportation technology, auto body technology, architecture/engineering technology, machine technology, welding, and administrative support.  This project proposes to construct a new building to the south of building O, in the space currently occupied by the track and football field. Read More »

 

Last Modified Nov 14, 2014